Constriction Governmental and Private - Mega Projects - NDL-Ethiopia Site
Categories Navigation
Mega Projects
- Constriction Governmental /Private
- Energy
- Ashegoda and Adama I wind power projects
- Fincha Amertinesh hydroelectric power project,
- Geba Hydro-power Project
- Genale(GD-3) Hydro-power Project
- 1-Project Summary(done)
- 2-Feasibility study(done)
- 3-Contract Agreement & Amendments(done)
- 4-Civil Design Works
- 5-Electro-Mechanical Design Works
- 5-Electro-Mechanical Design Works Attachments
- 5-Electro-Mechanical Design Works Attachments Basic Design
- Drawing
- Electrical Breaking & Rectifier Schematic Drawings
- Revise Design Drawings on Governor
- Revised Drawings of Industry Television System and Access Control System(R3
- Revised drawing for Main Unit (for Review)
- Geothermal project at Aluto Langano
- Gilgel Gibe III HEPP (1870 MW)
- Grand Ethiopian Renaissance Dam (GERD) (6000 MW)
- Tulu Moye and Abaya Project
- Infrastructure
- Manufacturing Industry
Documents and Media
Breadcrumbs
- Home
- Constriction Governmental and Private